Hydrant meter deposit fees

The council will consider changing the deposits charged for hydrant meters — the temporary water meters contractors use on job sites.

1 mention (1 this month)Last discussed Nov 4, 2026
MediumWater Utilities

Utility contracts for rate study, Good Earth infrastructure, and emergency generator

Both funds remain healthy — water net position around $141 million, sewer around $58 million — but cash is drawing down as the city catches up on deferred maintenance. Officials said rate and fee decisions, possibly bonds or grants, will need revisiting as capital spending continues.

8 mentions (1 this month)Last discussed Nov 4, 2026
HighWater Utilities

Sewer Master Plan adoption

The council would commit to a 20-40% local match to pursue a federal Economic Development Administration grant for designing the wastewater treatment plant project — a big-ticket infrastructure move.

2 mentionsLast discussed Aug 19, 2026
HighWater Utilities

Water treatment plant expansion and PFAS

Three city wells exceed EPA PFAS limits and the canal water has detections too, so the council approved a $10.9 million design contract to treat Truckee Canal surface water, remove PFAS and expand capacity to 30 million gallons per day. Compliance deadline is 2029, possibly extended to 2031.

1 mentionLast discussed Jul 15, 2026
MediumWater Utilities

Rolling Meadows Lift Station H2S treatment contract

A consent item proposed an annual contract with Evoqua Water Technologies, capped at $80,614.88, to rent equipment and treat hydrogen sulfide gases at the Rolling Meadows Lift Station.

1 mentionLast discussed May 6, 2026
MediumWater Utilities

Ricci Tank #2 construction

The council approved a $3.39 million contract to build a second Ricci water tank, plus a Shaw Engineering contract for oversight — a major investment in water storage capacity.

1 mentionLast discussed Apr 15, 2026
MediumWater Utilities

Storm Drain Master Plan

The city hired Lumos & Associates for up to $156,000 to plan how Fernley handles stormwater citywide. Flooding and drainage matter to every neighborhood, especially with growth underway.

1 mentionLast discussed Feb 18, 2026
HighWater Utilities

Freshwater intake and Highway 95A/Cottonwood roundabout funding

The city landed $2 million for its freshwater intake, and the state and NDOT got $2 million for a roundabout at the dangerous 95A/Cottonwood intersection. Torres says it's only a matter of time before a high schooler gets hit there.